Tishman Technologies served as Construction Manager for this large, fast-track co-location facility located along the Chicago River.

Phase I included the build-out of 55,000 square feet of technical space with all environmental equipment in place and on-line in 20 weeks. Equipment included air conditioning, AC power, UPS power, emergency power, DC power and equipment racks. Phase II, the second floor, included the build-out of 112,000 square feet in 12 weeks.